Why a full study
On a very large plant, soiling is not one number. It varies across a site by block, row and season: see soiling monitoring. Every full wash is also a big job. At 1–3 L/m² (NREL 2018; Naicker 2018), one wet wash of a 10 MWp plant, with about 48,000–55,000 m² of modules, uses roughly 50–150 m³ of water. Scale that to hundreds of megawatts and a wrong interval is expensive in either direction: too many washes waste water and crew time, too few waste energy.
Why performance ratio alone isn’t enough. Temperature-corrected performance ratio (PR) can give a good estimate of soiling in dry seasons, as long as the plane-of-array irradiance sensor is kept clean (IEA PVPS 2022). IEC 61724 recommends cleaning it weekly. PR still mixes soiling with clipping, outages and degradation, though. A study measures soiling directly, then uses SCADA and PR to check it.
What the study covers
- Soiling measurement across the site. Soiling stations or sensors in the blocks that soil differently, running through a dry spell so soiling rates can be fitted. See soiling monitoring.
- SCADA and PR analysis. Inverter and string data before and after cleans and rain, how the irradiance sensors are cleaned, and the losses that look like soiling but aren’t.
- Contaminant and water. What is on the glass, and whether the cleaning water meets the module maker’s limits. See soiling assessment and water testing.
- Cleaning review. Method, equipment, crew time, water use and cost per clean today.
- Cleaning economics. The optimal interval or trigger, and whether a coating pays back on your site.
- Costed programme. A plant-wide Restore → Protect → Maintain plan: method, calendar, water treatment, equipment, crew and products, plus the measurement plan that keeps it honest.
How the optimal interval is set
The right interval depends on your tariff, soiling rate and what a clean costs, and it changes with the season. The calculator works it out for your plant.
Energy value at the bid-window tariff, before cleaning costs; bid windows 1–4 in April-2020 rands. The plant makes about 19.9 GWh a year (Global Solar Atlas).
Why the study runs through the seasons
A short test can mislead, because the answer changes with the weather. The Vietnam case shows a coating paying more in the dry season than in the rainy season. In the peer-reviewed Green Energy Park trial in Morocco, Solar Wash Protect led in the dry season, while Industrial Glass Protect edged ahead in the rainy months of March and April (case study).
Position matters as much as season. At a Scatec-operated plant in Honduras, the test string sat nearer a road and was subject to much more dust than the two control strings (Case study: Chemitek (Portugal), with Scatec). A study that covers the blocks that soil differently, through a dry season and a wet one, tells you whether a coating or a new interval pays back across the whole year.
What you get
| Deliverable | What it tells you |
|---|---|
| Soiling map and rates | How fast each part of the plant soils, and when |
| Loss in MWh and rand | What soiling costs at your tariff |
| PR and SCADA review | Whether your monitoring shows soiling correctly |
| Cleaning economics | The optimal interval or trigger, and whether coatings pay back |
| Costed programme | Method, calendar, water, equipment, crew and products for the whole plant |
| Measurement plan | Which sensors stay, and the triggers your O&M team acts on |
Starting small. A study can start with a free pilot on a few strings, which proves the method and chemistry before the plant-wide numbers are run. On smaller plants, a site soiling assessment answers most of the same questions in one visit.
Chemitek products for this
- Clean + protectSolar Wash ProtectConcentrated PV cleaner that leaves an antistatic, anti-adherent layer. 18 module-maker letters of conformity.
- ProtectAntistatic Solar Armor 2.0Anti-soiling coatings dosed into the wash water at 1 kg to 1,000 L. At least 12 months of protection (Chemitek).
Running your own crews? You can order just these products from us, with or without our engineers.