Asset management support: Cleaning that is warranty-safe, recorded and proven

Done wrong, cleaning can scratch the glass and void the module warranty. We make it safe, visible and worth its cost: every method within the module maker's conditions, every clean on record, every result in energy and rand. Your O&M contractor keeps the site.

Ground-level view of a worker walking beside a raised panel row with an industrial facility visible in the hazy background
4 of 10
of the top ten module makers give a clear warning that improper cleaning voids the module warrantyChemitek, distributor presentation MKT.081 (slide 8)
6 checks
against the module maker's rules before anyone cleans: letter, water, pressure, brushes, heat, crewRenewChem method
Class A
IEC 61724-1 monitoring must include soiling measurementIEC 61724-1:2021, via IEA PVPS (2025)

Inside every module maker’s rules

A module warranty covers the modules, not the way they’re cleaned. Makers set cleaning conditions, and damage from cleaning outside them isn’t covered: Trina’s manual says so plainly, and Chemitek warns that scrapers or high-pressure cleaning will void the warranty. A letter of conformity approves a cleaning product only within the maker’s conditions. LONGi’s letter says in so many words that it is not a guarantee of warranty.

So before any clean, we check six things for each module series on your plant:

Check What we confirm
Letter of conformity The product’s letter covers your maker and your module series
Water Hardness, TDS and pH at the point of use, on the same basis as the maker’s limit
Pressure The machine’s setting at the nozzle, against the maker’s limit
Brushes and machines Bristle type, rotating heads, robot weight, and any approval the maker requires
Water temperature How far the water is from the module’s temperature
People That the crew is trained on the method and the maker’s rules

Bonded deposits are where modules get damaged: scraping cured cement or scale off the glass scratches the anti-reflective coating. We remove them chemically, with a removal agent the maker has approved, never with scrapers or high-pressure jets. The maker-by-maker limits are on warranty-safe methods.

Every clean on record

If a warranty claim, an insurance question or a lender’s review ever turns on how the modules were cleaned, the answer should be on file. Our washing procedures set out what the crew records after each section, and the O&M contractor keeps the log:

  • date, block and strings cleaned;
  • the crew, and their training on the method;
  • product, dilution and quantity;
  • water source, its hardness on the day, and any treatment;
  • nozzle pressure and brush type;
  • readings before and after: string current, soiling ratio or inverter output;
  • photos of the glass before and after;
  • anything done outside the maker’s conditions, and why.

We review the log against the method statement, spot-check cleans on site and test the water where the crew draws it. The log, the letters of conformity, the water tests and the method statements are kept together in one cleaning file per plant.

Reported in energy and rand

The KPIs we set up, plant by plant and for the portfolio:

A monitoring enclosure on a steel stand, powered by a small solar panel, beside the array at the North West pilot site
  • Soiling loss: soiling ratio and soiling rate by season, and the energy lost in MWh and in rand at each plant’s tariff.
  • Recovery per clean: the energy each clean recovers against its cost, and the performance ratio before and after, temperature-corrected and checked against soiling sensors so that clipping, curtailment and outages aren’t counted as soiling.
  • Cleaning efficiency: water used per m² and area cleaned per crew-hour.
  • Incidents: breakage, scratches and any work outside the maker’s conditions.

IEC 61724-1 requires soiling measurement for Class A monitoring. We choose, place and read the sensors (soiling monitoring) and set each plant’s cleaning interval from its own numbers (cleaning strategy).

Alongside your O&M contractor

We don’t take over the site, the crews or the contract. The O&M contractor runs the cleaning; we give it a method that stays inside the rules, train the crews and supply the Chemitek products with their safety data sheets. More on working with your O&M team.

Task Owner or asset manager O&M contractor RenewChem
Cleaning clause and KPIs Agrees them Delivers them Writes them
Method, products and water Approves them Applies them Designs them, supplies the products, tests the water
Records Receives them Keeps the log Sets it up and reviews it
Results Decides Reports output Measures soiling and recovery

Wind, CSP and plants not yet built

  • Wind: we inspect blades, tell you plainly whether it’s dirt or erosion, and clean blades, towers and nacelles by drone. Wind turbine blade cleaning
  • CSP: we measure mirror reflectance to the SolarPACES guideline and set wash triggers. CSP mirror reflectivity
  • Planned plants: a soiling study puts measured soiling into the yield model and the O&M budget. New-plant soiling study

Sources

  1. IEC 61724-1:2021, Photovoltaic system performance – Monitoring
  2. IEA PVPS Task 13, Soiling Losses – Impact on the Performance of PV Plants (2022)
  3. IEA PVPS Tasks 13 and 16, Understanding, Measuring, and Mitigating Soiling Losses in PV Power Systems, fact sheet (September 2025)
Show all 8 sourcesShow fewer
  1. LONGi, O&M Manual V2.0, §2.2.1
  2. Trina Solar, user manual UM-M-0002 (August 2024), §7.3
  3. Chemitek, product catalogue MKT.062 (p3): scrapers or high-pressure cleaning will void the warranty
  4. Chemitek, distributor presentation MKT.081 (slide 8)
  5. JA Solar, statement of conformity for Chemitek products (17 June 2025)

Asset management support

Common questions

Still have a question?

Ask one of our engineers. Tell us about your plant and we’ll answer it properly.

Send your question

Will cleaning products void our module warranty?

Not if the product has your module maker's letter of conformity and is used within the maker's cleaning conditions. The letter approves the product, not every way of using it: LONGi's says it is not a guarantee of warranty. We check both before any clean.

What records should our O&M contractor keep?

For every clean: date and strings, crew, product and dilution, water source and hardness, pressure and brush, readings before and after, photos, and anything outside the maker's conditions. We set up the log and review it.

Is RenewChem an asset manager?

No. Commercial, contractual and financial management stays with your asset manager. We give them the engineering evidence on cleaning and soiling, and work alongside the O&M contractor.

Can performance ratio show what a clean recovered?

Partly. Through a dry season, with clean irradiance sensors, the temperature-corrected PR trend gives a good estimate. Clipping, curtailment, outages and degradation also move PR, so we check it against soiling sensors.

Can you review the cleaning clause in our O&M contract?

Yes. We check it against the module makers' conditions and your soiling data, and propose the method, water standard, KPIs and records both sides can verify.

Can our contractor keep its crews and machines?

Yes. We design around the machines and water on site, and change them only where a maker's rule or the numbers say so.